CMHC Reaffirms 3.5 Million Housing Unit Gap in 2023 Update
CMHC's September 2023 update maintained its definition of the housing gap: 3.5 million additional units beyond projected business-as-usual construction, the same framing as its 2022 baseline. The headline number remained unchanged, as did the underlying metric.
CMHC published the update in September 2023. Both the original 2022 estimate and the 2023 update define the 3.5 million units as additional housing beyond projected business-as-usual construction. CMHC did not change from counting baseline separately to including it in the target. The gap remained defined as units required on top of existing construction trends.
The reframe matters because policy, financing, and land-use decisions are anchored to that number. When CMHC says Canada needs 3.5 million units, municipalities cite it to justify zoning changes, the federal government uses it to allocate funding for pipes and roads and electrical grids, and developers use it to plan and finance future projects. If the number includes baseline construction, the urgency is real but manageable. If it excludes baseline construction, the country is facing a generational undersupply that no current policy comes close to addressing.
What actually changed
CMHC's methodology treated business-as-usual construction as a baseline and measured additional supply needed on top of it. The September 2023 update reaffirmed this same approach, maintaining the 3.5 million figure as units required beyond projected baseline construction.
The 3.5 million-unit gap represents additional supply needed beyond baseline construction trends. Housing starts in any year contribute to closing that gap, but the target is defined as units above what would be built under business-as-usual projections, not as an absolute number reduced by each year's construction.
Housing starts in 2025 reached 259,028 units, according to CMHC. Under the old framing, that year's output would have been the baseline, and the 3.5 million would still be waiting on top of it. Under the new framing, 259,028 units became progress, and the remaining target dropped to roughly 3.24 million.
CMHC's 2023 update reaffirmed that the 3.5 million-unit target sits on top of baseline construction, maintaining the same framing as the 2022 estimate. No shift in definition occurred between the two reports.
Why this matters for investors and buyers
If the gap is smaller than the earlier framing suggested, the supply response will be smaller. Developers price future projects based on expected demand, and policymakers allocate money based on perceived urgency. A target that already includes trend-level construction signals less upside than a target that requires trend-breaking output.
For buyers, the revised framing suggests that current price levels might hold longer than the crisis narrative implied. If Canada can close the gap with modest acceleration rather than a doubling of output, the price relief many expected from a supply surge becomes less likely. Inventory might improve. Affordability might stabilize. But the sharp correction that a true supply emergency would eventually force is off the table under this version of the math.
The construction financing environment already reflects the lower-urgency read. Credit conditions tightened in 2025 and early 2026, and starts are projected to slow rather than accelerate. If the 3.5 million target genuinely required output beyond baseline, lenders and governments would be moving the opposite direction.
CMHC's 3.5 million-unit target represents the additional housing needed beyond projected baseline construction to restore affordability to 2004 levels by 2030—a consistent definition across both the 2022 and 2023 updates.
CMHC's September 2023 update maintained its definition of the housing gap: 3.5 million additional units beyond projected business-as-usual construction, the same framing as its 2022 baseline. The headline number remained unchanged, as did the underlying metric.
CMHC published the update in September 2023. Both the original 2022 estimate and the 2023 update define the 3.5 million units as additional housing beyond projected business-as-usual construction. CMHC did not change from counting baseline separately to including it in the target. The gap remained defined as units required on top of existing construction trends.
The reframe matters because policy, financing, and land-use decisions are anchored to that number. When CMHC says Canada needs 3.5 million units, municipalities cite it to justify zoning changes, the federal government uses it to allocate funding for pipes and roads and electrical grids, and developers use it to plan and finance future projects. If the number includes baseline construction, the urgency is real but manageable. If it excludes baseline construction, the country is facing a generational undersupply that no current policy comes close to addressing.
What actually changed
CMHC's methodology treated business-as-usual construction as a baseline and measured additional supply needed on top of it. The September 2023 update reaffirmed this same approach, maintaining the 3.5 million figure as units required beyond projected baseline construction.
The 3.5 million-unit gap represents additional supply needed beyond baseline construction trends. Housing starts in any year contribute to closing that gap, but the target is defined as units above what would be built under business-as-usual projections, not as an absolute number reduced by each year's construction.
Housing starts in 2025 reached 259,028 units, according to CMHC. Under the old framing, that year's output would have been the baseline, and the 3.5 million would still be waiting on top of it. Under the new framing, 259,028 units became progress, and the remaining target dropped to roughly 3.24 million.
CMHC's 2023 update reaffirmed that the 3.5 million-unit target sits on top of baseline construction, maintaining the same framing as the 2022 estimate. No shift in definition occurred between the two reports.
Why this matters for investors and buyers
If the gap is smaller than the earlier framing suggested, the supply response will be smaller. Developers price future projects based on expected demand, and policymakers allocate money based on perceived urgency. A target that already includes trend-level construction signals less upside than a target that requires trend-breaking output.
For buyers, the revised framing suggests that current price levels might hold longer than the crisis narrative implied. If Canada can close the gap with modest acceleration rather than a doubling of output, the price relief many expected from a supply surge becomes less likely. Inventory might improve. Affordability might stabilize. But the sharp correction that a true supply emergency would eventually force is off the table under this version of the math.
The construction financing environment already reflects the lower-urgency read. Credit conditions tightened in 2025 and early 2026, and starts are projected to slow rather than accelerate. If the 3.5 million target genuinely required output beyond baseline, lenders and governments would be moving the opposite direction.
CMHC's 3.5 million-unit target represents the additional housing needed beyond projected baseline construction to restore affordability to 2004 levels by 2030—a consistent definition across both the 2022 and 2023 updates.
Sources
Read Next
Restructuring Your Mortgage Is Not a Rescue Mission
What a Mortgage Rate Discount Is Designed to Keep You From Noticing
Bank of Canada Cuts Won't Save Your Fixed Rate From U.S. Inflation
7 Debt Ratio Checks That Set Your Mortgage Ceiling Before Your Credit Score Matters